Regina Bypass Traffic Management Update as of June 8

Regina Bypass Traffic Management Update as of June 8

Traffic Management Update

As of June 8

  

Regina Bypass

Dewdney Avenue between Pinkie Road and Condie Road

Hwy 33 (near Tower Road turnoff)

Tower Road (near old Pacer Park)

Hwy 11 near RBDB Farm House

Hwy 1 East North and South Service Roads

Pinkie Road

Watch for on-going

  • 24-hour equipment crossing
  • Temporary lane closures and speed reduction
  • Expect minor delays due to speed reduction
  • Work adjacent to road

 

 

North Bypass

Dewdney Avenue between Pinkie Rd and Condie Road – Ongoing

Equipment Crossing

Stop signs to be installed

Equipment to stop for public traffic

24-hour work zone

Both east bound and west bound lanes may be affected

Expect minor delays due to speed reduction

(VARIOUS)

 

East Bypass

Hwy 1 East (Balgonie to Tower Road) –  Ongoing

Temporary lane closures in multiple locations along Highway 1 East

Work adjacent to Highway 1 East or in the median

Both west bound and east bound lanes may be affected

Equipment crossing

Expect minor delays due to speed reduction

East bound closures will be from 6 am – 4 pm

West bound closures will be 9 am – 6 pm

(TCRF-Various)

 

 

South Service Road at Gravel Pit Road – ongoing

Base works, road widening and paving Work on shoulders for new in and out ramps

Single lane alternating traffic

Expect minor delays due to speed reduction

Work to be down between 7 am – 7 pm

(TCRF-480)

 

Hwy 1 East – ongoing

Guide Sign Installation

West bound lane closure

Work to be done between 9 am – 7 pm

Expect minor delays due to speed reduction

(TCRF-various)

 

White City Bridge – ongoing

Work in the Median and Adjacent to Highway 1

East bound lane closure from 7 am – 4 pm

Westbound lane closure from 9 am – 7 pm.

Expect minor delays due to speed reduction

(TCRF-495)

 

 

Hwy 1 East at Hwy 48 – ongoing

Work around White City bridge

East and west lane closures

East bound closures will be from 7 am – 4 pm

West bound closures will be 9 am – 7 pm

Expect minor delays due to speed reduction

(TCRF-495)

 

Hwy 364 just East of Hwy 46 – ongoing

Tie-in new North Service Road to existing North Service Road

Single lane alternating traffic

Traffic control team members will be on site

Work will be done from 7 am – 6 pm

Expect minor delays due to speed reduction

(TCRF – 433)

 

New South Service Road near Pilot Butte Access Road  – ongoing

Repaving

Watch for single lane alternate traffic

Traffic control team members will be on site

Work scheduled from 7 am to 7 pm

Expect minor delays due to speed reduction

(TCRF-490)

 

North Service Road – ongoing

Flaggers and single lane alternating traffic

Traffic Control People will be onsite releasing traffic on direction at a time

Work will be done adjacent to the North Service Road between Dyer Straits and Comfort Plus Campgrounds

Expect short delays between 7 am – 7 pm

(TCRF-356)

 

Hwy 364 – East of Hwy 46 – until June 8

Repaving

Single lane alternating traffic

Work to be done between 7 am – 4 pm

Expect minor delays due to speed reduction

(TCRF-499)

 

Hwy 1 East at Hwy 48 until June 8

Development of New Westbound Ramp

Short temporary closure of west bound lane

Work to be done between 9 am – 6 pm

Expect minor delays due to speed reduction

(TCRF-401)

 

South Service Road Between Galloway and Ramm Avenue – until June 14

Work on south service road

Single lane alternating traffic

Traffic Control People will be onsite releasing traffic on direction at a time

Work to be done between 7 am – 7 pm

Expect minor delays due to speed reduction

(TCRF-528)

 

Hwy 1 East – East of Hwy 624 – until June 30

Work on new ramps

East bound lane closure from 6 am – 4 pm

Expect minor delays due to speed reduction

(TCRF-492)

 

Hwy 1 East – West of Hwy 624 – until June 30

Work on new ramps and install culverts

East bound lane closure from 7 am – 5 pm

Expect minor delays due to speed reduction

(TCRF-460 and 491)

 

South East Service Road – East of Hwy 46 – until July 2

Repaving

Watch for single lane alternate traffic

Traffic control team members will be on site

Work scheduled from 6:30 am to 7 pm

Expect minor delays due to speed reduction

(TCRF-488)

 

Hwy 46 South of Hwy 1 East – until July 3

Tie-in to new Hwy 46

Single lane alternating traffic

Traffic control team members will be on site

Work will be done from 6:30 am – 7 pm

Expect minor delays due to speed reduction

(TCRF – 487)

 

North Service Road between Balgonie and Hwy 364 – until July 9

Service road rehabilitation

Single lane alternating traffic

Work to be done between 7 am – 4 pm

Traffic control team members will be on site

Expect minor delays due to speed reduction

(TCRF-221)

 

Hwy 46 close to Hwy 364 – until July 11

Tie new north service road to existing Hwy 1 East

Work adjacent to roadway

Work to be done between 6 am – 7 pm

Expect minor delays due to speed reduction

(TCRF-509)

 

Hwy 1 East – West of Hwy 46 – until July 12

Back Fill and Crane Work

East bound lane closure from 7 am – 4 pm

Westbound lane closure from 9 am -6 pm.

Expect minor delays due to speed reduction

(TCRF-364 and 337)

 

 

Hwy 1 East – East of Hwy 46 – until July 18

Guide Sign Installation

West bound lane closure

Work to be done between 9 am – 7 pm

Expect minor delays due to speed reduction

(TCRF-393)

 

Gravel Pit Road north of Hwy 1 East until August 2

Closure of southbound to westbound ramp and installation of culvert

Construction of on ramp and service road

Expect minor delays due to speed reduction

(TCRF-444 and 460)

 

Tower Road near Hwy 33 – until August 8

Earthworks adjacent to the roadway

Equipment crossing

Expect minor delays due to speed reduction and short stoppages

(TCRF-091)

 

 

South Bypass

Pinkie Road and Hwy 1 West

Permanent Ramp Closure

Westbound to northbound ramp closed

Traffic will now turn right at the top of the west bound off ramp at Pinkie Road.

Expect minor delays due to speed reduction

Watch for trucks crossing

(TCRF – Various)

 

Pinkie Road and Hwy 1 West

Permanent Ramp Closure

Southbound to Westbound long ramp closed

Motorists to use next westbound ramp just metres further

Expect minor delays due to speed reduction

Watch for trucks crossing

(TCRF – Various)

 

Hwy 1 West – West of Pinkie Road – ongoing

Work on or adjacent to road

West bound lane closure

Work to be done between 7 am – 7 pm

Expect minor delays due to speed reduction

(TCRF-494)

 

Hwy 6 near New Detour until June 14

24-hour equipment crossing

Expect minor delays due to speed reduction

Stop signs will be installed

Equipment will stop for public traffic

As this is a 24-hour project, lighting will be set up for night operations

(TCRF-302)

 

Pinkie Road just North of Hwy 1 West Interchange – until June 14

Shoulder Closures

North and South bound shoulder closure – work will include surveying and earthworks

Expect minor delays due to speed reduction

Work to be done between 7 am – 7 pm

(TCRF-465 and 464)

 

TWP #164 between Range Road 2194/Fleet Street until June 17

Equipment Crossing

Stop signs to be installed

Equipment to stop for public traffic

24-hour work zone

Both north bound and south bound lanes may be affected

Expect minor delays due to speed reduction

(TCRF-425)

 

Fleet Street between TWP #164/Old Hwy 16 Road until July 8

Equipment Crossing

Stop signs to be installed

Equipment to stop for public traffic

24-hour work zone

Both north bound and south bound lanes may be affected

Expect minor delays due to speed reduction

(TCRF-409)

 

Range Road 2192 to Old Hwy 16/ Township Road 164 – until July 29

24-hour equipment crossing

Expect minor delays due to speed reduction

Stop signs will be installed

Equipment will stop for public traffic.

As this is a 24-hour project, lighting will be set up for night operations

(TCRF-450)

 

Temporary closure of Park Street (gravel section) between TWP Rd 164 and TWP RD 162 – until November 4

Closed section used as haul road from the Borrow Pit

Detour in place

(TCRF-377)

 

Courtney Street at Hwy 164 (D Road) – until November 7

24-hour earth works

Work adjacent to roadway

Expect minor delays due to speed reduction

As this is a 24-hour project, lighting will be set up for night operations

(TCRF-502)

 

Hwy 1 West between Pinkie road and Condie Road – until November 7

24-hour earth works

Work adjacent to Hwy 1 West

Expect minor delays due to speed reduction

As this is a 24-hour project, lighting will be set up for night operations

(TCRF-510)