Bypass Traffic Management Update as of April 11

Bypass Traffic Management Update as of April 11

Regina Bypass

Dewdney Avenue between Pinkie Road and Condie Road

Hwy 33 (near Tower Road turnoff)

Tower Road (near old Pacer Park)

Hwy 11 near RBDB Farm House

Hwy 1 East North and South Service Roads

Pinkie Road

Watch for on-going

  • 24-hour equipment crossing
  • Temporary lane closures and speed reduction
  • Expect minor delays due to speed reduction
  • Work adjacent to road

 

 

North Bypass

 Hwy 11 near RBDB Farm House until April 30

Equipment Crossing

Work will be done from 6 am to 4 pm

Expect minor delays due to speed reduction

(TCRF – 384)

 

One (1) mile North of Scale to Courtney and Hwy 11 Intersection until April 30

Median work – building of pier caps and bridge columns

North bound and south bound fast lane closure

Work to be done from 6 am to 6 pm

Expect minor delays due to speed reduction

(TCRF – 383)

 

Courtney Road to TWP #164 until May 31

Equipment Crossing

Stop signs to be installed

Equipment to stop for public traffic

24-hour work zone

Both north bound and south bound lanes may be affected

Expect minor delays due to speed reduction

(TCRF-051)

 

East Bypass

 Hwy 1 East (Balgonie to Tower Road) –  Ongoing

Temporary lane closures in multiple locations along Highway 1 East

Work adjacent to Highway 1 East or in the median

Both west bound and east bound lanes may be affected

Expect minor delays due to speed reduction

East bound closures will be from 6 am – 4 pm

West bound closures will be 9 am – 6 pm

(TCRF-Various)

 

Hwy 1 East just west of Hwy 48 – until April 13

Work in centre median

West bound lane closure under the under the bridge

Expect minor delays due to speed reduction

Work to be done between 9 am – 5:30 pm

(TCRF-313)

 

Hwy 33 West of Tower Road – until April 13

Girder Erection for Bridges along Tower Road

Work from 7 am to 5 pm

VMS boards will be used seven days prior to work

Traffic control team will stop traffic for less than 15 minutes while girder is installed

Both west bound and east bound lanes may be affected

Expect minor delays due to speed reduction

(TCRF-407)

 

Emerald Park Road to Great Plains Road – until April 13

Installing street lights

Shoulder closures near the on and off ramps

Watch for single lane alternate on Emerald Park Rd and Great Plains

Expect minor delays due to speed reduction

Short stoppages in traffic will be needed when street light poles are raised

(TCRF-399)

 

Hwy 1 East off-ramp between Tower Rd and Gravel Pit Rd – until April 15

Temporary closure of west bound north service road off-ramp

West bound north service road off ramp will be closed during construction of temporary access road

Expect minor delays due to speed reduction

(TCRF-435)

 

Hwy 1 East between Tower Road and Gravel Pit Road – until April 15

Work Adjacent to the Highway

East bound and west bound  lane closure

Expect minor delays due to speed reduction

Work to be done between 9 am – 5:30 pm

(TCRF-424)

 

South Service Road between Gravel Pit Road and CP Rail Line until April 16

Implementation of Slight Detour

Both west bound and east bound traffic may be affected

Expect minor delays due to speed reduction

(TCRF-386)

 

Hwy 1 – East of Tower Road – until April 23

Delivery of Girders

East bound slow lane will be temporary closed from 6 am – 4 pm

Expect minor delays due to speed reduction

(TCRF-357)

 

Gregory Avenue West of Hwy 48 – until May 1

24-hour equipment crossing

Expect minor delays due to speed reduction

Traffic control team members will be on site

Stop signs will be installed

Equipment will stop for public traffic.

As this is a 24-hour project, lighting will be set up for night operations

(TCRF-329)

 

Pilot Butte Bridge – until May 8

Working in the Median and Adjacent to Highway 1

East bound lane closure from 7 am – 4 pm and westbound lane closure from 9 am -6 pm.

Expect minor delays due to speed reduction

(TCRF-310)

 

Hwy 364 just East of Hwy 46 – until May 29

Tie-in new North Service Road to existing North Service Road

Single lane alternating traffic

Traffic control team members will be on site

Work will be done from 7 am – 6 pm

Expect minor delays due to speed reduction

(TCRF – 433)

 

Hwy 46 North of Hwy 364 – until June 5

Tie-in new North West Service Road to existing Hwy 46

Single lane alternating traffic

Traffic control team members will be on site

Work will be done from 7 am – 6 pm

Expect minor delays due to speed reduction

(TCRF – 455)

 

North Service Road just east of Hwy 48 – until June 6

Flaggers and single lane alternating traffic

Traffic Control People will be onsite releasing traffic on direction at a time

Work will be done adjacent to the North Service Road between Dyer Straits and Comfort Plus Campgrounds

Expect short delays between 7 am – 7 pm

(TCRF-356)

 

Hwy 1 East at Hwy 48 until June 8

Development of New Westbound Ramp

Short temporary closure of west bound lane

Work to be done between 9 am – 6 pm

Expect minor delays due to speed reduction

(TCRF-401)

 

Hwy 1 East – West of Hwy 46 – until July 12

Back Fill and Crane Work

East bound lane closure from 7 am – 4 pm

Westbound lane closure from 9 am -6 pm.

Expect minor delays due to speed reduction

(TCRF-364 and 337)

 

Hwy 1 East of Hwy 46 – until July 18

Guide Sign Installation

West bound lane closure

Work to be done between 9 am – 7 pm

Expect minor delays due to speed reduction

(TCRF-393)

 

 

 

South Bypass

 

Pinkie Road and Hwy 1 West

Permanent Ramp Closure

Westbound to northbound ramp closed

Traffic will now turn right at the top of the west bound off ramp at Pinkie Road.

 

Pinkie Road and Hwy 1 West

Permanent Ramp Closure

Southbound to Westbound long ramp closed

Motorists to use next westbound ramp just metres further

Expect minor delays due to speed reduction

 

 

Park Street and Township Road 164 – until May 9

24-hour equipment crossing

Expect minor delays due to speed reduction

Stop signs will be installed

Equipment will stop for public traffic

As this is a 24-hour project, lighting will be set up for night operations

(TCRF-378)

 

Park Street and Township Road 164 – until May 9

24-hour equipment crossing

Expect minor delays due to speed reduction

Stop signs will be installed

Equipment will stop for public traffic.

As this is a 24-hour project, lighting will be set up for night operations

(TCRF-378)

 

Hwy 6 near New Detour until June 7

24-hour equipment crossing

Expect minor delays due to speed reduction

Stop signs will be installed

Equipment will stop for public traffic

As this is a 24-hour project, lighting will be set up for night operations

(TCRF-302)

 

TWP #164 between Range Road 2194/Fleet Street until June 17

Equipment Crossing

Stop signs to be installed

Equipment to stop for public traffic

24-hour work zone

Both north bound and south bound lanes may be affected

Expect minor delays due to speed reduction

(TCRF-425)

 

Fleet Street between TWP #164/Old Hwy 16 Road until July 8

Equipment Crossing

Stop signs to be installed

Equipment to stop for public traffic

24-hour work zone

Both north bound and south bound lanes may be affected

Expect minor delays due to speed reduction

(TCRF-409)

 

Range Road 2192 to Old Hwy 16/ Township Road 164 – until July 29

24-hour equipment crossing

Expect minor delays due to speed reduction

Stop signs will be installed

Equipment will stop for public traffic.

As this is a 24-hour project, lighting will be set up for night operations

(TCRF-450)

Temporary closure of Park Street (gravel section) between TWP Rd 164 and TWP RD 162 – until November 4

Closed section used as haul road from the Borrow Pit

Detour in place

(TCRF-377)

 

 